Akobo Minerals, a Scandinavian-based Ethiopian gold producer, has provided an operational update for January 2025 and details on the new vertical mine shaft with a 100-ton-per-day capacity.

Akobo Minerals reports gold production and new vertical mine shaft

  • Gold production: Slightly more than 2 kg of doré gold bar was produced in January, bringing total gold production to 17 kg to date. This was in line with expectations, as tunnel operations were temporarily halted from mid-December 2024 to mid-January 2025 for essential safety improvements. Both tunnels are now fully operational.
  • Increased production ahead: Stoping (mining the ore body) has commenced from the Western Winze, while the Eastern Winze is nearing completion for its prospect drive to start at the new 575 level. Going forward, mainly ore will be mined, marking a shift toward more stable production. It is important to highlight that underground mining in a deposit like Segele, which exhibits a strong nugget effect, naturally results in month-to-month production variations. While short-term fluctuations can occur, long-term production expectations remain unchanged.
  • All-time high gold price: The recent record gold price is expected to positively impact future cash flow from the Segele mine.

Establishment of a vertical shaft at Segele

Due to the compact and highly concentrated nature of the orebody, Akobo Minerals has decided to establish a vertical shaft to improve access and increase underground hoisting capacity. This infrastructure upgrade will significantly accelerate production, aligning it more closely with the processing plant’s capacity. Additionally, the vertical shaft will enable activation of the Carbon-in-Leach (CIL) circuit, increasing gold recovery rates from approximately 60% to 93%.

Key features of the vertical shaft:

  • Phase 1: Initial shaft depth of 60 meters, with infrastructure capable of extending to 120 meters.
  • Timeline: Expected completion within 12 to 16 weeks from commencement.
  • Design: Approximately 3 meters in diameter, accommodating cages, ventilation, water pumping, and electrical infrastructure.
  • Hoisting system:
    • Double-cage arrangement for personnel and ore transport.
    • Hoisting capacity of approximately 3 tonnes per hoist, with a total capacity of up to 100 tonnes per day, depending on underground ore availability.
    • Electrically powered winder, backed by a dedicated diesel generator with redundancy from the process plant’s power system.
  • Manufacturing and installation: Headgear, control, and winch rooms will be manufactured in South Africa and shipped to Segele for assembly and commissioning.

The transition to a vertical shaft represents a shift aimed at improving long-term production efficiency.

Pin It

CONTACT

Editor
Nellie Moodley 
Email: mining@crown.co.za
Phone: 084 581 2371

Advertising Manager
Rynette Joubert
Email: rynettej@crown.co.za
Phone: 082 937 1613


More Info