1. Cost-effective PERI climbing concept: with a
complete platform level and halved on-site wall
formwork requirements, fast and continuous work-
ing operations were achieved.
2. Type-tested and a high level of safety in all opera-
tional areas: PERI CB 240 and CB 160 climbing scaf-
fold systems on the inside and outside respectively.
3. Optimal jobsite results: PERI climbing formwork
solution with CB climbing platforms and accurately
rounded VARIO GT 24 wall formwork.
4. Safe and convenient: PERI UP Rosett Flex Steel
alternating staircases with 1 m step widths and
separate landings.
(Photos: PERI GmbH)